What kitchen demolition can include
Kitchen demolition needs a room-specific plan for cabinets, counters, appliances, utilities, and debris.
- Cabinets, counters, and backsplashes
- Flooring and non-structural finishes
- Appliances after safe disconnection
Prepare the job before pickup
Have water, gas, and electrical connections handled safely and identify walls or soffits that may contain utilities.
Send photos that show the items and the full path to the loading area. The crew will confirm the scope, access, and price before approved work begins.
Need help deciding what belongs in the load?
Review the items we take and the listed exclusions. If your item is not shown, call before moving it.